Civil engineering/excavation work for the pipeline route connecting the first drilling site at Schleidberg to the second site at Trappelberg—part of Vulcan Energy’s "Lionheart" project—intended for the future climate-neutral heat supply for the city of Landau, as well as lithium extraction and electricity generation via an ORC plant in Insheim in the state Rhineland-Palatinate, Germany taken on 10/12/2026 Image-No: 159868
Photo
Civil engineering/excavation work for the pipeline route connecting the first drilling site at Schleidberg to the second site at Trappelberg—part of Vulcan Energy’s "Lionheart" project—intended for the future climate-neutral heat supply for the city of Landau, as well as lithium extraction and electricity generation via an ORC plant in Insheim in the state Rhineland-Palatinate, Germany
taken on 10/12/2026
2026 Image-No: 159868
Resolution of the orignal 5747 x 3831 px
Please order your aerial photographs of Germany here.
(If you have aerial photos from other countries in the online shop's shopping cart, please pay in the
Online shop checkout
.)