Drone recording of Construction site of the eastern tunnel portal for the Astrid Tunnel for the underpass and bypass of Bad Bergzabern between B38 (Weinstraße) and B427 (Kurtalstraße) in Dörrenbach in the state Rhineland-Palatinate, Germany taken on 10/25/2024 Image-No: 143723
Photo
Drone recording of Construction site of the eastern tunnel portal for the Astrid Tunnel for the underpass and bypass of Bad Bergzabern between B38 (Weinstraße) and B427 (Kurtalstraße) in Dörrenbach in the state Rhineland-Palatinate, Germany
taken on 10/25/2024
2024 Image-No: 143723