Repowering Wind Farm Minfeld. JUWI replaces four old turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six megawatts. in Minfeld in the state Rhineland-Palatinate, Germany taken on 09/18/2025 Image-No: 149893
Photo
Repowering Wind Farm Minfeld. JUWI replaces four old turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six megawatts. in Minfeld in the state Rhineland-Palatinate, Germany
taken on 09/18/2025
2025 Image-No: 149893
Resolution of the orignal 5472 x 3648 px
Please order your aerial photographs of Germany here.
(If you have aerial photos from other countries in the online shop's shopping cart, please pay in the
Online shop checkout
.)