Aerial photograpy of Repowering of the wind farm Minfeld. JUWI is replacing four old turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six MW. in Minfeld in the state Rhineland-Palatinate, Germany taken on 12/27/2025 Image-No: 152477
Photo
Aerial photograpy of Repowering of the wind farm Minfeld. JUWI is replacing four old turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six MW. in Minfeld in the state Rhineland-Palatinate, Germany
taken on 12/27/2025
2025 Image-No: 152477