Aerial photograpy of Repowering of the Minfeld wind farm. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six MW. in Kandel in the state Rhineland-Palatinate, Germany taken on 02/07/2026 Image-No: 152992
Photo
Aerial photograpy of Repowering of the Minfeld wind farm. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six MW. in Kandel in the state Rhineland-Palatinate, Germany
taken on 02/07/2026
2026 Image-No: 152992