Aerial photograpy of Repowering of the Minfeld wind farm. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six megawatts. in Kandel in the state Rhineland-Palatinate, Germany taken on 06/17/2025 Image-No: 148382
Photo
Aerial photograpy of Repowering of the Minfeld wind farm. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six megawatts. in Kandel in the state Rhineland-Palatinate, Germany
taken on 06/17/2025
2025 Image-No: 148382