Repowering of the Minfeld wind farm. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six MW. in Kandel in the state Rhineland-Palatinate, Germany taken on 02/07/2026 Image-No: 152996
Photo
Repowering of the Minfeld wind farm. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six MW. in Kandel in the state Rhineland-Palatinate, Germany
taken on 02/07/2026
2026 Image-No: 152996
Resolution of the orignal 5265 x 3510 px
Please order your aerial photographs of Germany here.
(If you have aerial photos from other countries in the online shop's shopping cart, please pay in the
Online shop checkout
.)