Repowering of the wind farm Minfeld. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six MW. in Minfeld in the state Rhineland-Palatinate, Germany taken on 12/31/2025 Image-No: 152740
Photo
Repowering of the wind farm Minfeld. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six MW. in Minfeld in the state Rhineland-Palatinate, Germany
taken on 12/31/2025
2025 Image-No: 152740
Resolution of the orignal 5912 x 3941 px
Please order your aerial photographs of Germany here.
(If you have aerial photos from other countries in the online shop's shopping cart, please pay in the
Online shop checkout
.)