Repowering of the Minfeld wind farm. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six megawatts. in Kandel in the state Rhineland-Palatinate, Germany taken on 06/17/2025 Image-No: 148379
Photo
Repowering of the Minfeld wind farm. JUWI is replacing four older turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six megawatts. in Kandel in the state Rhineland-Palatinate, Germany
taken on 06/17/2025
2025 Image-No: 148379
Resolution of the orignal 5058 x 3372 px
Please order your aerial photographs of Germany here.
(If you have aerial photos from other countries in the online shop's shopping cart, please pay in the
Online shop checkout
.)