Repowering Wind Farm Minfeld. JUWI replaces four old turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six megawatts. in Minfeld in the state Rhineland-Palatinate, Germany taken on 06/17/2025 Image-No: 148380
Photo
Repowering Wind Farm Minfeld. JUWI replaces four old turbines (GE 1.5) from 2004 with two new, modern Vestas V162 turbines, each with a capacity of six megawatts. in Minfeld in the state Rhineland-Palatinate, Germany
taken on 06/17/2025
2025 Image-No: 148380
Resolution of the orignal 4835 x 3402 px
Please order your aerial photographs of Germany here.
(If you have aerial photos from other countries in the online shop's shopping cart, please pay in the
Online shop checkout
.)